Why Motif
Every IGA program has connector debt: the app onboarding that never happened. The backlog grows every quarter, and the audit gap with it. Three ways out, and they differ on when you get the connector, who keeps it running, and what it costs.
How it works
1Define scope and access
T+0Give us the target system and a service account. API docs if you have them. If not, agents map it by navigating directly.
2Agents build the connector
T+12hAgents run against your live system, map the provisioning workflows, and generate a deterministic script. An engineer reviews every step. No guessing, no synthetic data.
3End-to-end testing
T+48hQA'd against your live system, not a sandbox. Hundreds of self-test operations, then an engineer signs off before it ships.
4Deploy via SCIM/REST
ReadyYour IGA platform sees a standard SCIM/REST endpoint, nothing special to configure. Provisioning runs the deterministic script, no AI in the live path. When the target changes, agents catch the drift and patch it. No new engagement.
Capabilities
For IAM and IGA practices
Add Motif to your delivery stack.
Your clients carry connector debt, and clearing it used to mean months of PS work. With Motif you clear it in 48 hours: more connectors, faster delivery, higher margin, and the hard scope you used to pass on.
1Quote 48 hours
You have quoted 12 to 14 weeks because that is what connector builds take. With Motif you quote 48 hours and deliver it.
2You own the customer
Motif is your subcontractor. You keep the relationship, the SOW and the billing. We build the connector. White-label friendly.
3Cover the hard apps
Oracle EBS, SAP ECC, undocumented internal apps. The systems you used to avoid stop being delivery risk, so you can scope them with confidence.
Compose the future with us
From factory floors to financial powerhouses and mainframes to cloud, Motif builds the connectors for the systems governance never reached.
Motif exists for organizations ready to move into the next era of identity, beyond slow programs, heavy engineering and legacy constraints. If there is an app you have been putting off for years, that is the one to send us.
We're backed by Accel.
Good questions.
Not in the provisioning path. Agents build the connector and patch it. What runs in production is a compiled script, reviewed by an engineer.
No, and that is the point. We build it, host it, run it. You plug one SCIM endpoint into your platform. You get audit logs, not a script to babysit.
Agents health-check every 2 hours, catch the drift and patch it. An engineer reviews every change. No new quote, no new engagement.
No. Motif presents as a standard SCIM endpoint, so SailPoint, Saviynt, Oracle and Omada govern its connectors like any other app.
Both hand the work to someone. An SI at $150 to $300 an hour, an onboarding tool to your app teams. Motif is managed, so nobody on your side builds it.
Any app. SaaS without SCIM, internal tools, legacy on-prem, flat-file, JDBC, SOAP. If an admin can operate it, agents can automate it.
The connector your IGA program has been waiting on.
Tell us the app.
We'll have a production-ready connector in your IGA platform in 48 hours. Start with the worst of your connector debt. That's what Motif is built for.